Skip to content
  • Team
  • Story
  • Projects
  • Publications
  • Services
  • Blog
  • Careers
  • Contact
  • Search

Interbay Landfill Gas Extraction System

Methane is a potent greenhouse gas that is much more effective at trapping heat than carbon dioxide. It’s also a natural byproduct of waste decomposition at landfills. Herrera helped the City of Seattle address problems with the gas extraction system at the Interbay facility (a closed landfill) and, thereby, better manage methane gas emissions—which is critical in battling climate change and complying with environmental standards. We identified causes of system failure that trigger high methane alarms, and we developed a solution that enabled the City to maintain system function and reduce maintenance issues.

Location
Seattle, WA
Owner
City of Seattle Parks and Recreation
Project Contact
Mike Spillane, PE
Services
Waste and Materials Management
Project Type
Civil Engineering

Related Projects

View all projects →

Mercer Island Decant Facility Retrofit

→

Leachate Pump Station Upgrades at Cedar Hills Regional Landfill

→

White River at Pacific Right Bank Flood Protection Project Planning and Design

→

Seattle South Transfer Station Phase II Design Completion

→

Swift Creek Sediment Management Action Plan Implementation

→

Port Angeles Landfill Stabilization

→

Navigation

  • Team
  • Story
  • Projects
  • Publications
  • Services
  • Blog
  • Careers
  • Contact
  • Search

Our Offices

Seattle, WA

2200 Sixth Avenue
Suite 1100
Seattle, WA 98121
Phone (206) 441-9080
Contact: Phil Coughlan

Portland, OR

107 SE Washington Street
Suite 140
Portland, OR 97214
Phone (503) 228-4301
Contact: Ellen McClure

Missoula, MT

101 East Broadway
Suite 610
Missoula, MT 59802
Phone (406) 998-6760
Contact: Heidi Houck

Bellingham, WA

1329 North State Street
Suite 200
Bellingham, WA 98225
Phone (360) 398-5075
Contact: Chris Webb

Casper, WY

444 S. Center St.
Casper, WY 82601
Phone (206) 787-8219
Contact: Tyson Wright, PE

LinkedInFacebookTwitterInstagram

Join our Newsletter

Copyright © 2023 Herrera Environmental Consultants - Made by Needmore

Join Our Newsletter