Skip to content
Herrera
  • Team
  • Story
  • Projects
  • Publications
  • Services
  • Blog
  • Careers
  • Contact
  • Search

Big Cliff Remedial Investigation

We led the remedial investigation sampling of soil and sediment contamination at Big Cliff Reservoir, on the Santiam River near Detroit, Oregon. Herrera’s sampling plan guided collection of 85 surface sediment samples and 20 subsurface boring samples during reservoir drawdown, surface sediment samples using a boat and grab sampler from 16 reservoir locations upstream and downstream of the construction debris deposition area, and 20 surface and subsurface soil samples near a vehicle maintenance building. Results from sampling at this challenging site will lead to a more cost-effective, focused remediation plan.

Location
Detroit, OR
Owner
Army Corps of Engineers
Project Contact
Rob Zisette
Services
Remediation and Reclamation
Project Type
Environmental Science

Related Projects

View all projects →

White River at Pacific Right Bank Flood Protection Project Planning and Design

→

Dockton Beach Park Shoreline Restoration

→

Troy Mine Revegetation Services

→

Shirley Basin Uranium Waste Pile Reclamation

→

Swift Creek Sediment Management Action Plan Implementation

→

Black Pine Mine Reclamation

    →

Copyright © 2018 Herrera Environmental Consultants - Made by Needmore

Join Our Newsletter