Point Bolin Habitat Restoration
The Suquamish Tribe identified several Tribal allotments in the Point Bolin area that are experiencing ongoing coastal erosion along low to moderate bank shorelines. Herrera is working alongside neighbors and the Tribal government to evaluate shoreline, hydrogeologic, drainage, and ecologic conditions in the area that may be contributing to the coastal erosion. Herrera worked with local archaeologists to document the presence and locations of culturally significant resources, has conducted critical areas reconnaissance, and is developing design documentation for drainage, shoreline and stream restoration improvements to minimize upland impacts on coastal erosion, remove garbage, improve water quality, and enhance ecological conditions in the area. Through EPA grant funding, Herrera is developing design documentation through the 90% design stage to equip the Tribal government with what they need to pursue permitting and construction funding to implement the project. To accommodate the tight project timeline, we mobilized our team quickly, simultaneously conducted several site investigations (hydrogeologic, coastal geomorphic stormwater, wetlands, streams, cultural resources, land survey) and developed a high-level concept design to identify improvements that will help meet project goals. Because Herrera has much of the needed expertise in-house, we were able to work together nimbly to develop integrated, resilient solutions and make progress on grant deliverables quickly.